|
|
|
AVIATION
FT. MCMURRAY AIRPORT — FT. MCMURRAY, AB
|
DESCRIPTION
4,600 sq. ft. addition to the passenger hold room and baggage areas, with associated
renovation and upgrades to existing
main terminal. Completed 2004.
The Permasteel Group Copyright © 2006 Permasteel Corporation. All rights reserved.
Created by Iridophore
